Abu Dhabi · Doha · Houston · Singapore

Energy, engineered
with patience.

ORYX Energy Group develops, operates and services upstream, midstream and new-energy assets across three continents — safely, at scale, for the long century.

ORYX — EST. 1979 — LISTED ADX
0BOE / Day Operated
0Countries
0Revenue 2025
0Safe Man-Hours

Integrated Operations

From reservoir to renewable.

Four divisions, one operating standard — audited to the same HSE regime from the Rub' al Khali to the North Sea.

Division I

Upstream

Exploration and production across 14 concessions, onshore and shallow-water offshore.

1.4M BOE/day · 14 Fields
Division II

Midstream

4,200 km of pipeline, storage terminals and an LNG shipping joint venture.

4,200 km · 11 Terminals
Division III

Downstream

Refining, petrochemicals and aviation fuel supply for Gulf hub airports.

840K bbl/day Refined
Division IV

New Energy

Solar, hydrogen and carbon capture — 6 GW in development by 2030.

6 GW Pipeline · CCS 2027

Flagship Projects

Built for decades

Commissioning

Al Dhafra Gas Hub

Abu Dhabi · UAE
Capex$3.8B
Capacity1.2 BCF/d
Online2026
Operating

Corniche Energy Terminal

Ruwais · UAE
Storage8.4M bbl
Berths6 VLCC
Since2019
In Development

Oryx Green Hydrogen One

NEOM Region · KSA
Power2.2 GW
H₂240 kt/yr
FID2027
0Projects Delivered
0Countries of Operation
0Sq Ft of Facilities
0New-Energy Pipeline

The Group

Forty-seven years.
One operating creed.

Founded in Abu Dhabi in 1979, ORYX has grown from a single onshore concession into a listed energy group of 21,000 people — while keeping the discipline of a field operator: nothing ships until it is safe, tested and signed.

  • Zero Tier-1 process safety events for 6 consecutive years
  • Methane intensity of 0.05% — top decile globally
  • $2.1B committed to carbon capture and hydrogen by 2030
  • Long-term partners: ADNOC, QatarEnergy, Shell, TotalEnergies
Annual Report 2025
0People Worldwide

Project Delivery

The ORYX gate system

Gate I

Appraise

Subsurface, market and country-risk screening before a dollar is committed.

Gate II

Define

FEED, HAZOP and local-content planning to bankable accuracy of ±10%.

Gate III

Execute

EPC delivery under our own PMC teams — 380 projects, 92% on schedule.

Gate IV

Operate

Digital twins, predictive integrity and a 25-year asset stewardship plan.

ISO 9001ISO 14001ISO 45001 ISO 50001 EnergyAPI Q1 / Q2OGMP 2.0 Gold

Partner Voices

Trusted at the wellhead

“ORYX took over a distressed midstream asset and returned it to nameplate capacity in nine months. Quiet, methodical, exceptional.”

🇺🇸
Katherine DoyleInfrastructure Fund Partner · Houston

“Their gate reviews are the most disciplined we audit in the region. Capital goes exactly where the schedule says it will.”

🇩🇪
Dr. Jonas WeberLender's Engineer · Frankfurt

“Six years without a Tier-1 event across joint assets. ORYX's safety culture is a competitive advantage, not a compliance cost.”

🇸🇬
Adrian LimJV Operations Director · Singapore

Partnerships · Concessions · New Energy

The next fifty years
start with a meeting.

Our business development team responds to qualified partnership and investment enquiries within three business days.

Open a Conversation